Skip to product information

Pet GPS Tracker for Cats Real Time Location Finder

Pet GPS Tracker for Cats Real Time Location Finder

Regular price £54.99 GBP
Regular price £81.99 GBP Sale price £54.99 GBP
Sale Sold out

Currently this item has stock!

  • Buy 2 Products and Get 15% Off
  • 30-Day Money Back Guarantee
  • Free shipping with Royal Mail
  • Order before 11 PM = Shipped Tomorrow

FREE UK DELIVERY

  • Quick Dispatch (1–3 Working Days) : We process orders Monday–Friday and send them out promptly with full tracking.
  • Free Tracked UK Delivery : No minimum spend, simply order and relax.
  • Reliable & Transparent : Your time matters. Expect clear updates at every stage, from warehouse to doorstep.

See our Shipping Policy

EASY 30 DAYS RETURNS

Changed your mind ? Return unused items in their original packaging within 30 days. If an item is faulty or incorrect, we’ll cover return postage and arrange a replacement or refund. Refunds are issued to your original payment method within 7 working days of inspection.

See our Return & Refund Policy

PAWTRACK MINI – ACCURATE GPS TRACKING FOR CATS IN REAL-TIME

The PAWTRACK MINI is a GPS tracker specifically designed for cats, providing precise location updates in real-time through advanced satellite technology. Measuring 2 × 2 cm and weighing very little, it easily attaches to any cat collar without causing discomfort to your pet. Constructed from durable ABS material, it is designed for everyday use and ensures the safety of your cat wherever they may wander. You can start using it within minutes by simply inserting a Nano SIM card and beginning to track, with no recurring subscription fees required.

WHY SELECT PAWTRACK MINI FOR YOUR CAT?

  • Real-time location tracking – Get accurate and up-to-date location information
  • Extremely compact and lightweight – Ensures comfortable wear for your cat every day
  • Quick and easy setup – Start tracking your cat's location immediately after inserting the SIM
  • No ongoing subscription needed – A one-time purchase for complete peace of mind
  • Durable ABS construction – Built to withstand regular outdoor use

PRODUCT SPECIFICATIONS

  • Material used – High-quality ABS plastic
  • Dimensions – 65.5 × 37 × 18.3 mm
  • Network compatibility – 2G Nano-SIM, GPS + BDS + LBS
  • Battery life – 500 mAh, with 15 hours to 5 days of standby time
  • Note: Availability is limited to certain regions

CONTENTS OF THE PACKAGE

  • 1 × PAWTRACK MINI GPS tracking device
  • 1 × USB cable for charging
  • 1 × User guide and manual
View full details
4.7/5(2749+ reviews)

Your Own Words

“The colour is even better in person and it's so soft and warm without feeling bulky. I've barely taken it off since it arrived.”

Sophie R. / York

Verified Customer Sophie R. / YorkWomen's Acrylic Turtleneck Sweater

“Great quality shirt, feels smart but really comfortable and the fit is spot on. Already eyeing up another colour.”

James W. / Bristol

Verified Customer James W. / BristolMarcell Men's Classic Button-Down Shirt

“Lovely oversized fit and a gorgeous neutral grey. Thrown over jeans and a tee it makes me look instantly put together.”

Emma T. / Manchester

Verified Customer Emma T. / ManchesterLoreline Women's Oversized Blazer

“Brilliantly warm without being heavy and the two-tone colour looks really smart. I've worn it every day since it turned cold.”

David H. / Leeds

Verified Customer David H. / LeedsArdent Men's Insulated Puffer Jacket

“Really comfy and the denim blue goes with everything. Loads of compliments already and I've ordered a second pair.”

Hannah L. / Brighton

Verified Customer Hannah L. / BrightonCasual Blue Wedge Slide Sandals

“Proper quality knit, warm and not at all scratchy. The blue is a lovely rich colour and I've had a few compliments already.”

Paul M. / Sheffield

Verified Customer Paul M. / SheffieldMen's Knit Turtleneck Sweater

“Beautiful coat, the suede feels far more expensive than the price. Lovely length and it drapes so well over everything.”

Margaret P. / Harrogate

Verified Customer Margaret P. / HarrogateWomen's Suede Trench Coat

“Smart, well cut and the material feels substantial. It smartens up jeans or works over a suit, really versatile.”

Andrew C. / Edinburgh

Verified Customer Andrew C. / EdinburghMen's Tailored Coat

“So flattering on and the print is gorgeous in real life. Comfortable high waist and the wide leg is very forgiving.”

Carol S. / Bath

Verified Customer Carol S. / BathWomen's Wide Leg Jeans

“Comfiest joggers I've owned, good thick fabric and the fit isn't baggy. The pockets are actually useful too.”

Stephen R. / Cardiff

Verified Customer Stephen R. / CardiffMen's Cotton Cargo Joggers

“So easy to slip on and genuinely comfortable to walk in all day. The leather is lovely and soft and they're true to size.”

Linda K. / Chester

Verified Customer Linda K. / ChesterLuxury Leather Slide Sandals

“Lightweight but surprisingly warm, perfect for this time of year. It looks far more expensive than it was.”

Ian B. / Nottingham

Verified Customer Ian B. / NottinghamMen's Quilted Lightweight Jacket

30 Days Money Back Guarantee

At OutfitLondon, your satisfaction is our promise. If you’re not completely happy with your order, you can return it within 30 days for a full refund, no questions asked.

Frequently Asked Questions

What payment methods do you accept?

Visa, Mastercard, American Express and PayPal.

How long does delivery take?

Standard delivery across the United Kingdom is 7–14 working days.

Orders are processed within 1–3 working days (Mon–Fri). You’ll receive tracking by email.

Track your parcel via our tracking page.

Can I change or cancel my order?

We can amend details or cancel within 24 hours of purchase, provided the order hasn’t been dispatched.

Once in transit, changes aren’t possible.

What is your returns policy?

You can return items within 30 days in unused condition with original packaging.

If an item is faulty or incorrect, we cover return postage. For change-of-mind returns, the customer covers return postage.

See our Return & Refund Policy for more informations.

How do I contact customer support?

If you have any questions or need assistance, please contact our customer support team.

You can reach us by email at support@outfitlondon.com or via our contact page.

Our Design Philosophy

At OutfitLondon, we believe fashion should feel as effortless as it looks. More than clothing, our pieces are created to inspire confidence, bring comfort, and reflect your personal style. From the first sketch to the final stitch, every detail is considered and crafted with premium fabrics, modern lines, and lasting quality. Each collection is made to move with you, wherever life takes you.